PROJECT
Current Location:HOME > PROJECT >

Castle Ground Scaffolding

Key word:Castle Ground Scaffolding

Date:2019-08-09Author:365truss
The 365truss design was erected quickly and safely, while also optimising security to the working area.  This was an important safety factor given the proximity of the work area to visitors in the Castle grounds.Additionally, a loading platform was built to full height with a landing platform every eight metres inside the scaffold for materials to be hoisted and stored, with our Stairtower system also rising to the full height of the scaffold.
 
 
The buttress design, which comprised a stepped back configuration, itself created a visuallyimpressive aspect to the scaffold installation – perhaps fitting in such a dramatic location, which will continue to impress visitors for many years thanks to the management’s commitment to ongoing restoration, and the use of high quality access systems.